S-34.1, r. 1 - Regulation respecting petroleum exploration, production and storage in a body of water

Full text
98. The authorization holder must seal the stratigraphic survey within 30 days after completion of the drilling.
The Minister may require that the work start before that period for safety reasons or give an additional period for its completion if the holder shows that it is necessary.
O.C. 1251-2018, s. 98.